Answer:
11/12
Step-by-step explanation:
2/3+1/4
8/12+3/12= 11/12
A high school coach needs to buy new athletic shorts for 15 members of the basketball team. The coach must spend less than $200 and needs to determine how much he can spend per pair of shorts.
Answer:
Well i dont know the answers but it is 13.33
Step-by-step explanation:
He can spend 13 dollars per pair of shorts
A soccer player passes the ball from a point that is 18 yards from the endline and 12 yards from the sideline. A teammate who is 42 yards from the same endline and 50 yards from the same sideline receives the pass. (See figure.) How long is the pass? (Round your answer to the nearest yard.)
The answer would be 44.9 yard.
Zeke kicked a football 92 yards. Zane estimated it at 90 yards. What percent error did Zane make? If a decimal, round the percent to 2 decimal places.
Answer:
Zeke had a 2.17% margin of error in his estimation.
Step-by-step explanation:
To set this problem up, you would need to create a proportion. X, the percent of error you're trying to find, should be over 100%. It should look like:
2/92 = X/100
This would translate your terms, the distance the football was kicked, into percentage terms. You should have 2/92 rather than 90/92. 90/92 would give you how accurate Zeke's estimate was instead of is percent of error.
Cross-multiply your numbers:
(2)(100) = 92X
200 = 92X
X = 2.1739
Then, once you round it, your answer would be X = 2.17.
Write the equation of the line that passes through the given points. (0,3) and (-17,1)
Whats the answer? Need help ASAP
Answer:
the equation: y=2/17x+3
the slope: 2/17
Step-by-step explanation:
Write an equation of the line in slope-intercept form that passes through ( -2, 5) and is parallel to y=4x.
A. Y=-2x+13
B. Y=4x-3
C. Y=-2x-3
D.y=4x+13
Sara owns a tree farm. Variety A of a pine tree is shipped to her at 12 inches tall and grows at a rate of 14 inches per year. Variety B of a pine tree is shipped to her at 2 inches tall and grows at a rate of 16 inches per year
Which equation can be used to determine the number of years, 2, at which the trees will be an equal height?
A:14 + 12x= 16 + 2x
B:16 + 12x = 14 +2x
С:12 + 16x =2 + 14x
D:12 + 14x= 2 + 16x
Answer:
The answer is D
The equation that can be used to determine the number of years at which the trees will be an equal height is -
14x + 12 = 16x + 2
What is the general equation of a Straight line?
The general equation of a straight line is -
[y] = [m]x + [c]
where -
[m] → is slope of line which tells the unit rate of change of [y] with respect to [x].
[c] → is the y - intercept i.e. the point where the graph cuts the [y] axis.
We have Sara owns a tree farm. Variety A of a pine tree is shipped to her at 12 inches tall and grows at a rate of 14 inches per year. Variety B of a pine tree is shipped to her at 2 inches tall and grows at a rate of 16 inches per year.
Variety [A] = 14x + 12
Variety [B] = 16x + 2
The equation that can be used to determine the number of years at which the trees will be an equal height is -
14x + 12 = 16x + 2
Therefore, the equation that can be used to determine the number of years at which the trees will be an equal height is -
14x + 12 = 16x + 2
To solve more questions on straight lines, visit the link below-
brainly.com/question/20400984
#SPJ5
A table measures 3.5 ft by 2.5 ft. What is the area of the table?
Answer:
A = 8.75 [tex]ft^{2}[/tex]
Step-by-step explanation:
Area of a table is
A = Length x Width
Given: Length=3.5ft and Width=2.5ft
A = 3.5ft x 2.5ft = 8.75 [tex]ft^{2}[/tex]
A company's stockwas selling at 24$ a share.A month later it was selling at $30 a share. What is the percent gain
Answer:
20%
Step-by-step explanation:
% increase = (final − initial) / initial × 100%
= (30 − 25) / 25 × 100%
= 20%
Answer:
The percent gain is 25%
Step-by-step explanation:
Avi uses a 3.5-m
ladder to climb up
to his tree house.
The foot of the
ladder is 0.8 m
from the tree. How
far
up
the tree does
the ladder reach?
Find the area of a room that has a length of 3x + 1 and a width of 2x + 3.
Answer:
6x^2+11x+3
Step-by-step explanation:
Area= Length*Width
Area= (3x+1)(2x+3)
Use method FOIL (Front,Out,In,Last)
(3x*2x)+(3x*3)+(2x*1)+(3*1)
= 6x^2+9x+2x+3
Simplify:
6x^2+11x+3
what is 2(u-3)=6u+10
Answer: =-4
Step-by-step explanation:
Will mark brainliest - GEOMETRY, show work plz
Answer:
1. Slope is 3/2
2. Slope is -2/3
3. Slope is 3/2
Step-by-step explanation:
Plz mark as Brainliest!
Answer:
Step-by-step explanation:
(-8-4)/(5+3)= -12/8= -3/2
perp. 2/3
y - 4 = 2/3(x + 3)
y - 4 = 2/3x + 2
y = 2/3x + 6
y - 4 = -3/2(x + 3)
y - 8/2 = -3/2x - 9/2
y = -3/2x - 1/2
In response to very high demand, a new bike has been marked up by 25% and is now selling for $210.00. How much was the bike before the mark-up?
Answer:
210.00 divided by 4 = 52.5 then you would subtract 210 by 52.5 and you would get 157.5.
Step-by-step explanation:
Please help! 30 points!
Use the numbers:
6 3 5 4 2 1
in that order to make 100. Use brackets and the four operations.
Answer:
((6 x 3 + 4/2) x 5 ) / 1
The ratio of right-handed students to left-handed students is 8 to 3.There are 520 right-handed students in school.How many students are left-handed
Answer:
195 students are left-handed
Step-by-step explanation:
Here, we want to calculate the total number of students who are left-handed
Let the total number of students in the school be x
The total ratio is 8 + 3 = 11
8/11 * x = 520
8x = 11 * 520
x = (11 * 520)/8
x = 715 students
So the number of students who are left handed will be;
Total - number of right-handed students
That would be;
715-520 = 195
Which equation is parallel to a line with a slope of 2 and passes through (2, -1)
Answer:
y=2x-5
Step-by-step explanation:
What is the system of equations represented by the table of values for continuous
linear functions, f(x) and g(x), shown below?
Answer:
A
Step-by-step explanation:
Answer: A
Step-by-step explanation:
Brainiest to the first CORRECT answer
Step-by-step explanation:
(9.16 * -30)= -27.48
(5.5 x 160)° 880
What is the image of (−8,2) after a reflection over the y-axis?
Answer:
8, -2
Step-by-step explanation:
Alinehasaslopeof 1/3 anda y-intercept of –5What isitsequationin slope-intercept form? Write your answer using integers, proper fractions, and improper fractions in simplest form.
Answer:
[tex]y = \frac{1}{3}x - 5[/tex]
Step-by-step explanation:
Given
[tex]slope\ (m) = \frac{1}{3}[/tex]
[tex]y\ intercept = -5[/tex]
Required
Determine the line equation in slope intercept
The equation of a line in slope intercept is:
[tex]y = mx + b[/tex]
Where
[tex]m = slope = \frac{1}{3}[/tex]
[tex]b = y\ intercept = -5[/tex]
So, [tex]y = mx + b[/tex] becomes
[tex]y = \frac{1}{3}x - 5[/tex]
Angie and Kenny play online video games. Angie buys 1 software package and 1month of gameplay. Kenny buys 1 software package and 2 months of game play. Each software package costs $30. If their total cost is $90, what is the cost of one month of gameplay?
Answer: $10
Step-by-step explanation:
Angie buys = 1 software package and 1month of gameplay.
Kenny buys = 1 software package and 2 months of game play.
Cost of each software package = $30. Total cost = $90
The total cost is the addition of what Kenny and Angie bought. This will be:
(1 SF + 1 G) + (1 SF + 2 G) = 90
where,
SF = software package = 30
G = game
(1 SF + 1 G) + (1 SF + 2 G) = 90
30 + 1G + 30 + 2G = 90
60 + 3G = 90
3G = 90 - 60
3G = 30
G = 30/3
G = 10
One month of game play cost $10
Mars is about 35,000,000 miles away from earth. If the moon is 250,000 miles away from earth, about how many times further is Mars?
Answer:
mars is 140 times farther than the moon
Step-by-step explanation:
hope this helped :-)
Suppose babies born in a large hospital have a mean weight of 3831 grams, and a variance of 108,900. If 65 babies are sampled at random from the hospital, what is the probability that the mean weight of the sample babies would be less than 3882 grams? Round your answer to four decimal places
Answer:
0.8944
Step-by-step explanation:
We start by calculating the z-score
To calculate the z-score, we shall need the standard deviation
Mathematically, standard deviation is square root of variance
that will be; SD = √108,900 = 330
Formula for z-score is;
x-mean/SD/√n
where n is 65 in this case
z-score = (3882-3831)/330/√65 = 1.25
The probability we want to calculate is;
P( X < 1.25)
we can use the standard normal distribution table for this
Using the table;
P( X < 1.25) = 0.89435 which is 0.8944 to 4. decimal places
Answer:
0.8944
Step-by-step explanation:
After traveling 345 miles, the Johnston family stopped at a rest stop for lunch. Looking at the map, they realized they had completed 3/5 of the trip. If d represents the total distance in miles, which equation can be used to find d?
A. 3/5 divided by d = 345
B. 3/5 x d = 345
C. 345 x d = 3/5
D. 345 divided by d = 5/3
Answer:
B
Step-by-step explanation:
Answer:
B. 3/5 x d = 345
Step-by-step explanation:
2. H(x) is a quadratic function and H(1) = 1, H(-2) = 16, and H(3) = 11. What is the value of H(-1)?
A. 7
B. 3
C. -3
D. 8
E 5
Answer:
d
Step-by-step explanation:
what is 2+2 and what is your favorite song?
Answer:
2+2=4 and my fave song is blood in the water
Step-by-step explanation:
Mark Deathshot brainliest
Answer:
4 and i see a dreamer
Step-by-step explanation:
what the number 820.681 in expanded form using powers of 10
Answer:
[tex]820.681 = 8 \times 10^2 + 2 \times 10^1 + 6 \times 10^{-1} + 8 \times 10^{-2} + 1 \times 10^{-3}[/tex]
Step-by-step explanation:
[tex]820.681 = 8 \times 100 + 2 \times 10 + 6 \times 0.1 + 8 \times 0.01 + 1 \times 0.001[/tex]
[tex]820.681 = 8 \times 10^2 + 2 \times 10^1 + 6 \times 10^{-1} + 8 \times 10^{-2} + 1 \times 10^{-3}[/tex]
I have to order it from least to greatest in absolute value, and i dont get it can anyone help?
Answer:
ight A on top since it's the cmallest followed by B,C,D,E
Step-by-step explanation:
Work out, giving your answer in its simplest form:
5/
14
x
7/
30
A hospital bill is estimated to be $480.00. It ends up actually costing the patient $524.50. What is the percent of error in the bill? Round to the nearest tenths place.
Answer: 8.484%
Step-by-step explanation:
The formula for percentage error is calculated as:
= (actual value observed - expected value) / expected value × 100
where,
Actual value observed = $480.00
Expected value = $524.50
Percent error = ($480.00 - $524.50)/$524.50 × 100
= -$44.50/$524.50 × 100
= -0.08484 × 100
= -8.484
= 8.484%